Step 1 The ground is marked with spray paint or a string line. A small sod cutter is used to remove the grass around existing beds.
Step 2 All concrete is mixed onsite using a small mixer and trailer. There is no heavy equipment or concrete trucks on your property.
Step 3 The concrete is fed into the small extruding machine. This creates a continuous piece of concrete curb.
Step 4 The curb is smooth finished with a hand trowel, or textured using our special stamping tools. Control joints are cut and tooled to allow for expansion.
Doyle Van Dyke – 712-203-0484
725 West 21st St. – South Sioux City, NE 68776 * Fax – 402-494-5337